Case Studies
 
Case 6:
Client: A Leading Manufacturing Firm

Problem Posed: Low Productivity, high inventory (30 days), High Manufacturing Costs

iStrat Problem Analysis: Traditional working systems, improper Layouts, roles & responsibilities not defined, Material handling problems

iStrat Solution: Implementation of Business Process Re-engineering & Toyota Production System

End Result: Productivity Increase of 45%, High Inventory reduced to 11 days, Costs reduced by 25%

Case 7:

Clients: Leading Manufacturing Firms, SME

Problem Posed: Higher Manpower Costs

iStrat Problem Analysis: Improper Work Distribution, Poor Manpower Planning, Roles and Responsibilities not defined

iStrat Solution: Applied MOST (Maynard Operation Sequence Technique by H. B. Maynard & Company, Inc) - A latest state-of-art Work Measurement technique in Direct areas viz. Machining lines, Assembly lines, Painting, Fabrication, Welding, Packaging & Indirect areas of stores, accounts & other clerical work at the Clients' site.

End Result: Cost reduction of around 10%

Case 8::

Client: Manufacturing Firm

Problem Posed: High Inventory

iStrat Problem Analysis: Poor production control system, Coordination between suppliers, vendors and subcontractors and client was not smooth, logistics bottlenecks

iStrat Solution: Applied Kanban Systems, Logistics & Inventory Management, and concept of Just in Time (JIT)

End Result: Reduction of Inventory from 20 days to 10 days

Case 9:

Client: Manufacturing Firm

Problem Posed: High Rejection rates, High Cost of Poor quality, Systems & Procedures does not exists for departments.

iStrat Problem Analysis: Need for Quality Systems such as

iStrat Solution: Instrumental in implementation of ISO 9000, QS-9000, instrumental in making Quality documents such as departmental procedures, FMEA, PPAP, APQP. Certified Auditor for ISO 9000, QS-9000

End Result: Implemented ISO 9000, QS 9000

case 10:

Client: Manufacturing Firm

Problem Posed: Morale of the Employee is low, no initiative form employees towards productivity & quality improvement, Weak IR relations.

iStrat Problem Analysis: Need to strengthen Continuous improvement methods, its recognition scheme for continuous improvements

iStrat Solution: Implementation of Kaizen and spreading of Kaizen Culture, work place improvement through 5 S and moving the organization towards TQM

End Result: Implemented Kaizen, employees started solving problems through Kaizen Methodology & contributing 5 Kaizens per month     

 